Cagayan de Oro City | MV SHENG AN, a foreign containerized vessel docks at the Port of Cagayan de Oro (CDO) on 04 February 2024 at 01:24 in the morning from its last port call at Port of Cebu.
The last foreign containerized vessel call that discharged and loaded containers was documented last March 2011. The AS ROMINA, also a foreign containerized vessel docked on March 14, 2022, with its purpose for Ship’s Change Crew and its cargo being simply incidental.
Sailing under the flagship of China, MV SHENG AN has a length overall (LOA) of 171.9 meters, width of 29 meters, and with arrival draft of 5.8/7.5 (forward/after). MV SHENG AN, unloaded a total of 40 containers of Ammonia and 138 empty containers, and loaded 170 full container containing mango halves, desiccated coconut Products, other chemicals.
MV SHENG AN departed from Port of CDO on the same day at 06:41 PM.
P-agbangon
P-ag-unlad
A-bot tanaw
“Sa progresibong Pantalan, aasenso ang bayan.”
Facebook: @portsauthorityph
Twitter: @ph_ports
Youtube: @ph_ports
Instagram: @ph_ports
TikTok: @ph_ports